up date Jan. 6th '96

 This week we got the shaft in. We had to forget adding a cutlass bearing in the hull.  

 

 The pedestal and cockpit floor is being installed. Control and steering cables still to be hooked up.

Fresh water lines have been run. Basic 12V and 120V AC wiring is in. The turtle has been mounted. Engine is aligned. Exhaust system has been run all the way aft to the exhaust thru hull.